Safe Work Method Statements (SWMS)
Whs Swms Downloads
Go like the clappers with our Smart SWMS – you’ll be havin smoko in no time. Download now and work smarter.
INSTANT DOWNLOAD
SAFE WORK METHOD STATEMENTS
-

Builders Clean + WAH
$285.00 -

Cleaning
$185.00 -

Glazing
$185.00 -

Handyman + WAH
$285.00 -

Heavy Diesel maintenance repair
$185.00 -

Labourer Work
$185.00 -

Painting + WAH (incl pressure wash)
$285.00 -

Pest Control
$185.00 -

Pick & Collect (Franna) Crane Operations
$185.00 -

Stump Grinder
$185.00 -

Tower Crane
$185.00 -

Tree Work with Wood Chipper + Stump Grinder
$285.00 -

Vehicle maintenance & breakdown
$185.00 -

Woodchipper
$185.00 -

Pumping
$285.00 -

Working at Heights
$185.00 -

Excavation and Trenching Permit
$185.00 -

Confined Space
$185.00 -

Solar & Battery Storage
$185.00 -

Aircon Installation HVAC
$185.00 -

Carpentry
$185.00 -

General Building
$185.00 -

General Electrical
$185.00 -

All Concreting
$365.00 -

Bricklaying
$185.00 -

Concrete Pumping
$185.00 -

Complete Civil Earthworks
$445.00 -

Concreting
$185.00 -

Construction Landscaping
$285.00 -

Drum Roller operation
$185.00 -

Excavation
$185.00 -

Excavation & Trenching
$185.00 -

Excavator Operation
$185.00 -

Cutting/Drilling/Grinding Concrete
$185.00 -

Fencing
$185.00 -

Gas Fitting
$185.00 -

General Plumbing
$185.00 -

Land Clearing
$185.00 -

Loader Operation
$185.00 -

Mowing & Gardening
$185.00 -

Painting
$185.00 -

Site Establishment
$185.00 -

Skid Steer
$285.00 -

Soft Landscaping
$185.00 -

Stump Grinding
$185.00 -

Tiling
$185.00 -

Tipper Truck
$185.00 -

Tipper Truck & Water Cart
$185.00 -

Traffic Control
$185.00 -

Tree Work
$185.00 -

Waterproofing
$185.00 -

All Roofing
$185.00 -

Wood Chipping
$185.00 -

Asbestos Removal
$185.00 -

ATV operation
$185.00 -

Bobcat Operation
$185.00 -

Building Renovations
$185.00 -

Cleaning – General
$185.00 -

Cleaning and Basic Maintenance
$185.00 -

Commercial Cleaning
$185.00 -

Commercial Dive Work
$185.00 -

Crane Truck Operation
$185.00 -

Demolition
$185.00 -

Dogman/Rigger
$185.00 -

Domestic Cleaning
$185.00 -

Excavator with Mulcher Operation
$185.00 -

Fibre Optic Cabling
$185.00 -

Forklift Operation
$185.00 -

Front End Loader operation
$185.00 -

Glazier
$185.00 -

Grader Operation
$185.00 -

Handyman
$185.00 -

Locksmith
$185.00 -

Mobile Crane Operation
$185.00 -

Office Risk Register
$185.00 -

Office+ Site Work Risk Register
$185.00 -

Roof & Gutter Cleaning
$185.00 -

Roof Restoration/Painting
$185.00 -

Scaffolding Erection
$185.00 -

Shed Erection
$185.00 -

Shower Renovation
$185.00 -

Skid Steer loader operation
$185.00 -

Telehandler Operation
$185.00 -

Tractor/Slasher Operation
$185.00 -

Warehousing
$185.00 -

Warehousing Risk Register
$185.00 -

Welding / Fabrication
$185.00 -

Builders Clean
$185.00 -

Cabinet Kitchen Installation
$185.00 -

Cabinet Kitchen Joinery
$185.00 -

Cleaning +Pressure Washing + Gutter + Working At Height
$445.00 -

Concrete Cutting/Drilling
$185.00 -

EV Charger Install
$185.00 -

Pressure Washing (gernhi)
$185.00 -

Shed/Carport Erection + Working At Heights
$285.00 -

Window Cleaning
$185.00 -

Tree Work + Working at heights
$285.00 -

Tiling + Waterproofing
$285.00 -

Tree Work + Stump Grinder
$285.00 -

General Plumbing + Working at Heights
$285.00 -

Painting + Working at heights
$285.00 -

Tree Work + Chipper
$285.00 -

Aircon Install + Working At Heights
$285.00 -

All Roofing + Working At Height
$285.00 -

Building + Painting + Roof + Concrete + Working at heights
$445.00 -

Cleaning + Pressure Washing
$285.00 -

Electrical + Aircon Insallation + Solar + Working at heights
$445.00 -

Electrical + HVAC + Working at Height
$385.00 -

Electrical + Solar + Working at Height
$385.00 -

General Plumbing + Gas Fitting + Working at Height
$385.00 -

Commercial Cleaning + Working At Height
$285.00 -

Domestic Cleaning + Working At Height
$285.00 -

Glazier + Working At Height
$285.00 -

Gutter replacement + Working At Heights
$285.00 -

Metal Roofing + Working At Heights
$285.00 -

Mobile Crane + Dogman/Rigger
$285.00 -

Pressure Washing + Working At Height
$285.00 -

Roof Restoration + Working At Heights
$285.00 -

Sign Writing Installation + Working At Height
$285.00 -

Welding / Fabrication + Field Work
$285.00 -

General Plumbing + Gas Fitting
$285.00 -

General Plumbing + Excavation & Trenching
$285.00 -

General Plumbing + Confined Space
$285.00 -

General Building + Working at heights
$285.00 -

Electrical + Aircon HVAC
$285.00 -

Electrical + Solar Installation
$285.00 -

Electrical + Confined Space
$285.00 -

Electrical + Working at heights
$285.00 -

Carpentry + Working at heights
$285.00 -

All Concreting + Working at Heights
$445.00 -

Bricklaying + Working at heights
$285.00 -

All Landscaping + Mowing & Gardening
$445.00 -

Tiling + Waterproofing + Working at Heights
$355.00 -

Excavation + Pumping + Concreting
$285.00 -

Excavation + Concreting+Cutting/grinding
$285.00 -

Concreting + Pump + Pressure Wash
$285.00 -

Building + Working at heights + Painting + Roof
$385.00 -

Tree Work + Chipper + Stump + Working at heights
$365.00 -

General Plumbing + Working at Heights + Gas Fitting + Confined Space + Excavation & Trenching
$445.00 -

Tree Work + Chip + Stump + Working at heights + Traffic
$455.00 -

Electrical + Aircon Insallation + Solar + Working at heights+ Confined Space
$445.00
FREQUENTLY ASKED QUESTIONS
Because we’re psychic… or just really good at guessing what you’re going to ask!
What is a SWMS?
A Safe Work Method Statement (SWMS) is a document that outlines hazards and the measures needed to keep workers safe during high-risk construction work.
How do I use a SWMS?
A SWMS must be prepared before work starts. While a generic SWMS can be used for routine tasks, it should be reviewed and tailored for each new activity.
What do I need to do?
The Person Conducting a Business or Undertaking (PCBU) is responsible for preparing a SWMS for high-risk activities before work begins.
Who should prepare a SWMS?
The person responsible for the high-risk work should prepare the SWMS, consulting with the workers involved to ensure it’s accurate.
Can a generic SWMS be used?
Yes, but it must be customised to the specific risks and conditions of the workplace to comply with safety regulations.